Time between base coat and clear coat - Team Camaro Tech
Team Camaro Tech join team camaro
 
Camaro Parts at SS396.com     
GROUND UP & SS396.com         
Official Sponsor of Team Camaro
   

Auto Insurance



Registered users (free) do not see these large ads

Body Shop Paint & Body Forum

Reply
 
Thread Tools Display Modes
  #1  
Old Sep 5th, 06, 03:08 PM
Bob O Bob O is offline
Tech Team

 
Join Date: Aug 2006
Posts: 44
Default Time between base coat and clear coat

I've read several articles on base coat/clear coat painting but have not seen this addressed. Maybe it isn't pertinent but I would like to make sure. I'm ready to spray my '67 and would like to know if there is a minimum or maximum time to wait after spraying the base coat before applying the clear coat? Is the clear applied as soon as the base dries, should you wait 'til the next day, what's the best way to proceed? Thanks.
Reply With Quote
Sponsored Links
Advertisement
 
  #2  
Old Sep 5th, 06, 03:21 PM
tired68 tired68 is offline
Senior Tech

 
Join Date: Jun 2005
Posts: 332
Default Re: Time between base coat and clear coat

You need to read the P-sheet for the brand of paint you plan to use. For instance, PPG's DBC/DBI product specifies a time between coats of 5-10 minutes and a "Dry Time to Clearcoat" of 15 minuts at 70F with a maximum of 24 hours.

If you miss the 24 hour window for getting your clear coat sprayed out, you'll need to scuff the base to specs, spray another coat of base and then clear within the 24 hour window.

Other products have different recoat windows. Learn your way around the product sheets for the paint you've chosen before starting the job. Most paint vendors have the product sheets online. If you can't find them, your paint jobber has them at the counter. Many paint failures are the result of incorrect product use and recoat window is an important spec. Missing the recoat window will reduce or prevent the chemical bond between layers and clear can peel off.
Reply With Quote
  #3  
Old Sep 5th, 06, 03:25 PM
heavy_chevy29 heavy_chevy29 is offline

dan
 
Join Date: Jul 2006
Location: new jersey
Posts: 19
Default Re: Time between base coat and clear coat

it really depends on the manufacturer. it could be anywere from 10 to 30min. get a tech sheet for the base you are using. or call the palce you ordered it from. they should know. i usaully wait 10-15min between base and clear unless there is a problem. also, another factor to consider is the reducer that you are using. that will also help determine the flash time in between coats.
__________________
68 project car
84 z28 with scott shafiroff 434sbc (576hp-582 ft-lbs of torque)
Reply With Quote
Sponsored Links
Advertisement
 
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
"Basics of Basics" Plastic filler ("Bondo") MARTINSR Body Shop 10 Sep 18th, 06 08:26 PM
welding....need help 69ss350camaro Body Shop 3 Apr 3rd, 03 01:20 PM
Expanded MARTINSR Body Shop 11 Jan 15th, 03 01:57 PM
Welds complete and grinding; MartinSr. type question shelbydog Body Shop 13 Dec 6th, 02 05:04 PM
filler primers my68 Body Shop 36 Feb 27th, 02 06:21 PM


All times are GMT -7. The time now is 09:22 AM.



Camaros.net - 2009 AutoForums.com